top of page
Drive :
  • Looking at indicators and project current attitude, the project manager negotiates with her team the suitable pace to use and the best path to follow.

  • Driving does not require detailed knowledge about the way the project is organised beforehand... provided the indicators are sensible and designed properly.

​​
Mayuki's contribution :​
  • connection of requirements of any level with expected deliverable result

  • measurement of various department activities versus expected technical result

  • design of prototype reports using

    • local or hosted database,

    • viewing scripts or Excel with database connection,

    • portals such as Tableau or Power-BI.

bottom of page